Holding for more upside. Won?t be stopping anytime soon.
Newbie85 ( Date: 10-Sep-2025 12:15) Posted:
|
Closed the rest at 16 too...Dont care what happen next...heh
makdatok ( Date: 11-Sep-2025 15:38) Posted:
|
Trading pause levels 11, 14 and 16 should have Shorts.
Not sure if they have covered for the day.
Let's see.
Close half at 16...Secured $2500 in the pocket liow...shukran
makdatok ( Date: 11-Sep-2025 12:08) Posted:
|
Time to sell?
tankoksee ( Date: 11-Sep-2025 15:33) Posted:
|
20 otw!
superstartup ( Date: 11-Sep-2025 15:02) Posted:
|
V nice gold theme play. Huge trading volume. Let's see how high this counter can go.
superstartup ( Date: 11-Sep-2025 09:28) Posted:
|
Thanks for the kopi....:)
SmallSmall ( Date: 11-Sep-2025 14:27) Posted:
|
Then tmr opening jump 3 pips...lol
Volmax ( Date: 11-Sep-2025 14:33) Posted:
|
Shiok Arh......
Can Close 15 Today....
Good News Can Go 25...
I think can past 15
$0.012 cleared laio...
SmallSmall ( Date: 11-Sep-2025 11:56) Posted:
|
i am queing up to sell at 13.. holding for so long alrdy.. pek chek..
I think theres room for more upside
I join at 11 😁
How many percent does Wilton holds gold mining stock  PT Wilton Makmur Indonesia (PT WMI) now?
The last I read there were some settlement between the company and Datuk Chong.
 
The last I read there were some settlement between the company and Datuk Chong.
 
Partake news?
Volmax ( Date: 11-Sep-2025 09:06) Posted:
|
Bought a bit over here purely for short term gold theme trading.
No fundamental to speak of.
Please perform your own DD
No fundamental to speak of.
Please perform your own DD
Watch It, Cheong Anytime Soon!
Heng Ong Huat Arh....
  Excerpt From Condensed Interim For 2HFY24 Announced On 14 July
" In fourth quarter of 2024, the Group&rsquo s Ciemas Gold Project had been affected by the heavy rainfall caused by La Nina a hydrometeorological disaster since early December 2024. The heavy rainfall had caused flash floods, landslides, power outage, and damage to roads and bridges. As at the date of this results announcement, the Group has not resumed operations at the Processing Facility. The supply of electricity has stabilised with the support of Perusahaan Listrik Negara (an Indonesian state-owned electricity provider), and the restored electricity is currently sufficient to support the site office, base camp, water pumps, and lighting at the Group&rsquo s Processing Facility. However, the supply of electricity remains insufficient to meet the full operational requirements of the Group&rsquo s Processing Facility.
In addition, access to the mine site remains severely restricted due to ongoing infrastructure challenges. Damage to roads and bridges continues to prevent the delivery of essential supplies, including fuel, to the mine site. The Company continues to monitor the situation at the Group&rsquo s Processing Facility closely and is prioritising the evaluation and advancement of strategic options in light of the prevailing challenges. "
By Now, Most Of The Damage To Road & Bridges Should Have Been Repair And Essential Supplies Like Fuel Should Be Available Now.

 
" In fourth quarter of 2024, the Group&rsquo s Ciemas Gold Project had been affected by the heavy rainfall caused by La Nina a hydrometeorological disaster since early December 2024. The heavy rainfall had caused flash floods, landslides, power outage, and damage to roads and bridges. As at the date of this results announcement, the Group has not resumed operations at the Processing Facility. The supply of electricity has stabilised with the support of Perusahaan Listrik Negara (an Indonesian state-owned electricity provider), and the restored electricity is currently sufficient to support the site office, base camp, water pumps, and lighting at the Group&rsquo s Processing Facility. However, the supply of electricity remains insufficient to meet the full operational requirements of the Group&rsquo s Processing Facility.
In addition, access to the mine site remains severely restricted due to ongoing infrastructure challenges. Damage to roads and bridges continues to prevent the delivery of essential supplies, including fuel, to the mine site. The Company continues to monitor the situation at the Group&rsquo s Processing Facility closely and is prioritising the evaluation and advancement of strategic options in light of the prevailing challenges. "
By Now, Most Of The Damage To Road & Bridges Should Have Been Repair And Essential Supplies Like Fuel Should Be Available Now.
