jbb?
time for this to wake up, at 0.745 with 3% dividend is well better than any bank or FD interest. 
still intact with TP 0.93 within 6-12 mths
still intact with TP 0.93 within 6-12 mths
OKP secures S$87.3 million contract for Jurong Region Line infrastructure
This raises the group&rsquo s net construction order book to S$627.2 million
[SINGAPORE] Mainboard-listed infrastructure and civil engineering company OKP : 5CF -1.32% announced on Monday (Mar 9) that it has secured a contract valued at about S$87.3 million from the Land Transport Authority (LTA) for commuter infrastructure works along the Jurong Region Line (JRL).
The 60-month project, which officially commenced on Feb 27, 2026, increases the group&rsquo s net construction order book to S$627.2 million, with projects now extending through to 2031. 
Under the terms of the agreement, OKP&rsquo s wholly owned subsidiary, Or Kim Peow Contractors, will manage the design and construction of both high and standard covered linkways to provide sheltered connectivity for pedestrians and commuters. 
The scope of work also includes the development of cycling paths, shared paths, footpaths and associated roadworks. 
Additionally, the contract covers the reconstruction, modification, or reinstatement of affected infrastructure within the project precincts, including retaining walls, drains, roads, trees and turfing.
&ldquo This project places us at the heart of Singapore&rsquo s next phase of rail expansion,&rdquo group managing director Or Toh Wat said. 
&ldquo While the new MRT line will reduce travel times and improve convenience, the surrounding infrastructure is also crucial in ensuring a seamless commuting experience,&rdquo he added.
The JRL project follows a series of other LTA contracts previously awarded to OKP&rsquo s subsidiaries for the construction of cycling path networks across Singapore.
These prior engagements are a S$258.3 million contract for the east region secured in May 2025 a S$92.9 million contract for western Singapore a S$78.3 million contract covering the central, Kallang, Bukit Merah and Bukit Timah regions and a S$188.3 million contract for works across seven towns in the east.
On Mar 4, Acting Minister for Transport Jeffrey Siow said that the completion of the JRL first stage will be  delayed by six months.
The first stage will open in mid-2028, instead of around the end of 2027 as originally projected.
The tender to operate and maintain the JRL was won by a  joint venture between ComfortDelGro subsidiary SBS Transit and French multimodal transport operator RATP Dev  in 2024.
Shares of OKP ended flat at S$0.76 on Friday.
OKP' s 2HFY2025 earnings up 15.3% to $25.1 mil
OKP Holdings reported a 15.3% increase in 2HFY2025 earnings to $25.1 million, bringing full-year net profit to $44.3 million, a 31.3% increase. The company plans to pay a final dividend of 0.7 cent and a special dividend of 1.3 cents.
 
let the goondo selling, while the fisherman are collecting cheap. 
excellent result which will pop back to $1 in no time
excellent result which will pop back to $1 in no time
sell on news
Excellent set of results. 
 
 
waiting to break 86 and heading to 93 (per Lim& Tan projected TP) 
creeping up slow and steady 
https://okp.listedcompany.com/misc/Lim-and-Tan-Update-Report-OKP-Holdings-4Feb26.pdf
Lim and Tan updates target price to $0.93
Take note that the previous target was pre-bonus price.
I would wait for everything to settle down after 16 Feb. Right now, the bonus shares are not credited. I expect more volatility after that.
holding up well and consolidation in the 80s, TP $ 1.00 hopefully by end Feb.
Looking at the unusual high volume I think 90c is possible.
$1.00 coming!!!!!!!
$1.00 coming!!!!!!!
whiteegg ( Date: 30-Jan-2026 14:07) Posted:
|
if can close near $0.90 today will be fantastic, this is a solid company with huge orders on hand. 
$1.00 coming!!!!!
By end February 2026?
By end February 2026?
buy on dips
Rightstock ( Date: 30-Jan-2026 09:14) Posted:
|
no chance to hit $2
Rightstock ( Date: 28-Jan-2026 15:33) Posted:
|
Tomorrow is the last day of trading before the bonus 3 for every 4 shares ex date on Friday 30 January 2026.
2 more days before the ex date. 3 bonus shares for every 4 shares owned. After the ex date investors will owned 7 shares.
OKP bonus issue 3 for 4 every shares
Ex date 30 January 2026
Bonus shares to be credited on 16 February 2026
Ex date 30 January 2026
Bonus shares to be credited on 16 February 2026
Rightstock ( Date: 22-Jan-2026 09:38) Posted:
|