Post Reply
3181-3200 of 3208
Stuck at 25cts
Looks like reversing down due to warrant starts trading today.
if you were to include today' s wrts trading, now its 31.5 cts (mother share = 25cts + wrts = 6.5cts)
andreytan ( Date: 31-Mar-2014 11:37) Posted:
Yes, u are observance, but 25 is too little, maybe higher a little more, close to 29/30.
golden_SGX ( Date: 31-Mar-2014 09:13) Posted:
BB has accumulated cheaply a lot @ 0.22-0.235cts ...
now has to push back to 0.25, which is the ave. cost now?
|
|
|
|
Tritech inching up day by day. 
Tritech had won approx 28mil of contracts in 2014 (3mths) compared agt 14mil of contracts for 2013 full year
It does look like it will win more contracts from LTA (Thomson Line) since winning Safety awards from LTA in late 2013
half an hour into our rally call   at   0925 hrs ,   Tri-tech rose 6% from 23.5 at open   to 25c day high
for more specifics , google " sgx swinger " to sign up for preview to join freebee chat room for fre
hello123 ( Date: 31-Mar-2014 08:55) Posted:
Watch Tritech... may rally soon...
|
|
I said 0.25 is only the ave. cost now...
it was heading to that direction of close to 29/30 since last month, if not only the market was dampened when DOW drops 300pts, Russia Orders Troop Maneuvers Amid Ukraine Tensions & to a lesser extent the missing of MH370 Flight Incident.
it shld test 0.265cts (pre-split px 0.53cts) first, before heading to 29/30.
andreytan ( Date: 31-Mar-2014 11:37) Posted:
Yes, u are observance, but 25 is too little, maybe higher a little more, close to 29/30.
golden_SGX ( Date: 31-Mar-2014 09:13) Posted:
BB has accumulated cheaply a lot @ 0.22-0.235cts ...
now has to push back to 0.25, which is the ave. cost now?
|
|
|
|
Yes, u are observance, but 25 is too little, maybe higher a little more, close to 29/30.
golden_SGX ( Date: 31-Mar-2014 09:13) Posted:
BB has accumulated cheaply a lot @ 0.22-0.235cts ...
now has to push back to 0.25, which is the ave. cost now?
KepoChicken ( Date: 31-Mar-2014 07:48) Posted:
Please dun just put the general statement la...
Why coming?
How Soon...?
|
|
|
|
BB has accumulated cheaply a lot @ 0.22-0.235cts ...
now has to push back to 0.25, which is the ave. cost now?
KepoChicken ( Date: 31-Mar-2014 07:48) Posted:
Please dun just put the general statement la...
Why coming?
How Soon...?
kelvinLim123 ( Date: 31-Mar-2014 01:06) Posted:
Tritech coming soon.   
|
|
|
|
Watch Tritech... may rally soon...
AWARD OF S$6.68 MILLION PROFESSIONAL DESIGN SERVICES CONTRACT                                       
The Board of Directors of Tritech Group Limited (the " Company" and together
with its subsidiaries,
the " Group" ) wishes to announce that its wholly-owned subsidiary, Tritech Consultants Pte Ltd (" Tritech Consultants" ),
has been awarded a S$6.68
million contract " Professional Design Services Agreement - Contract T209 Design for Lentor
Station and Associated Temporary Work / TERS Design for Thomson Line" (the ?Contract?) by
the
China Railway No.5 Engineering
Group Co., Ltd, Singapore Branch (" CR5" ).
Tritech Consultants has been engaged by CR5 for the provision of services of requisite professional engineering, expert and technical advice, skills and services in respect
of the design of all disciplines including civil and structural,
geotechnical, architectural, mechanical and electrical works for Thomson
Line ? Contract T209.
The Contract is a sub contract to Contract T209 of the Land Transport
Authority which covers the
design, construction and completion of Lentor
Station (LTR) and construction and completion of twin bored
tunnels between Lentor Station and contract 210, cut and cover tunnels at the crossover box
and associated ancillary works.
The Thomson Line is a fully underground
MRT system and is approximately 30 km long. There will be 22 stations and the line will connect Woodlands in the north to the Central Business District (CBD) and the
Marina Bay area in the
south.
The duration of the Contract is from 17 March 2014 to 30 April 2016. There is no defects liability period.
None of the Directors or substantial shareholders of the Company has any interest, direct or indirect,
in the
Contract (other than
through their shareholdings in
the Company).
The Contract is not expected to have any material impact on the consolidated earnings per share
and/or net tangible
assets per share of the
Group for the current financial
year
ending 31 March 2014.
BY ORDER OF THE
BOARDDr Wang XiaoningManaging Director
21 March 2014
of course good... shld. anticipate price to move up on Monday.
ysh2006 ( Date: 21-Mar-2014 20:36) Posted:
Today announced another small project 6 over millions   awarded by LTA...good ?
golden_SGX ( Date: 21-Mar-2014 19:59) Posted:
It push up the price to 0.235 in the early morning ... today many must be playing on the other counters like HanKore, LionGold, RH PetroGas, etc.
wait till monday again to see if can push up the price, if not wait for more announcements in the coming month of April.
|
|
|
|
Today announced another small project 6 over millions   awarded by LTA...good ?
golden_SGX ( Date: 21-Mar-2014 19:59) Posted:
It push up the price to 0.235 in the early morning ... today many must be playing on the other counters like HanKore, LionGold, RH PetroGas, etc.
wait till monday again to see if can push up the price, if not wait for more announcements in the coming month of April.
|
|
It push up the price to 0.235 in the early morning ... today many must be playing on the other counters like HanKore, LionGold, RH PetroGas, etc.
wait till monday again to see if can push up the price, if not wait for more announcements in the coming month of April.
but the high part of the contract value goes to Tritech and the low part get sub-con to do other things...
edwinjup ( Date: 20-Mar-2014 19:46) Posted:
Why the contract value so low and yet need to do so many things...contract value around 5 million sg dollar
golden_SGX ( Date: 20-Mar-2014 19:39) Posted:
AWARD OF RMB24.36
MILLION WASTE WATER
TREATMENT CONTRACT IN CHINA
 
The
Board of Directors of Tritech Group Limited (" Tritech" or the " Company" ) wishes to announce that its
wholly-owned subsidiary, Anhui Clean Environment Biotechnology Co. Ltd, had on 28 February 2014, been awarded a RMB24.36 million waste water treatment contract (" Contract" ) by HuaRong
Xuehua Brewery (Henan) Co.
Ltd (" HuaRong" ).
 
The
Contract is to provide
1) the design of the waste water treatment plant 2) construct the structural work
of the waste water treatment plant 3) supply and install the equipment of the waste water treatment plant and
4) adjust and commissioning of the waste water treatment plant with a total capacity of 8000m3/day
(the " Project" ).
 
The
Project is located at XueDianZhen Industrial Park, XingZhen City, Henan, China. This is a typical waste water treatment project for brewery industry, which Anhui Clean Environment Biotechnology Co.
Ltd has been specialising in for more than
10 years.
 
The
duration of the Contract is 400 days from
the
signing of the Contact, inclusive of 210 days for design
and construction, 90 days for adjustment and
commissioning
as well as 100
days for maintenance and handover.
 
None of the Directors
or
substantial shareholders of the Company has any interest, direct or indirect, in the
Contract
(other than
through their shareholdings in
the
Company).
 
The
Contract is not expected to have any material impact on the consolidated earnings per share and net
tangible
assets per share of the Group
for
the current financial year ending 31
March
2014.
 
 
 
BY ORDER OF THE BOARD
Dr Wang Xiaoning
Managing Director
20 March 2014
|
|
|
|
Tritech this project maybe don't make money that is why take one month after contract award ....
edwinjup ( Date: 20-Mar-2014 19:46) Posted:
Why the contract value so low and yet need to do so many things...contract value around 5 million sg dollar
golden_SGX ( Date: 20-Mar-2014 19:39) Posted:
AWARD OF RMB24.36
MILLION WASTE WATER
TREATMENT CONTRACT IN CHINA
 
The
Board of Directors of Tritech Group Limited (" Tritech" or the " Company" ) wishes to announce that its
wholly-owned subsidiary, Anhui Clean Environment Biotechnology Co. Ltd, had on 28 February 2014, been awarded a RMB24.36 million waste water treatment contract (" Contract" ) by HuaRong
Xuehua Brewery (Henan) Co.
Ltd (" HuaRong" ).
 
The
Contract is to provide
1) the design of the waste water treatment plant 2) construct the structural work
of the waste water treatment plant 3) supply and install the equipment of the waste water treatment plant and
4) adjust and commissioning of the waste water treatment plant with a total capacity of 8000m3/day
(the " Project" ).
 
The
Project is located at XueDianZhen Industrial Park, XingZhen City, Henan, China. This is a typical waste water treatment project for brewery industry, which Anhui Clean Environment Biotechnology Co.
Ltd has been specialising in for more than
10 years.
 
The
duration of the Contract is 400 days from
the
signing of the Contact, inclusive of 210 days for design
and construction, 90 days for adjustment and
commissioning
as well as 100
days for maintenance and handover.
 
None of the Directors
or
substantial shareholders of the Company has any interest, direct or indirect, in the
Contract
(other than
through their shareholdings in
the
Company).
 
The
Contract is not expected to have any material impact on the consolidated earnings per share and net
tangible
assets per share of the Group
for
the current financial year ending 31
March
2014.
 
 
 
BY ORDER OF THE BOARD
Dr Wang Xiaoning
Managing Director
20 March 2014
|
|
|
|
Why the contract value so low and yet need to do so many things...contract value around 5 million sg dollar
golden_SGX ( Date: 20-Mar-2014 19:39) Posted:
AWARD OF RMB24.36
MILLION WASTE WATER
TREATMENT CONTRACT IN CHINA
 
The
Board of Directors of Tritech Group Limited (" Tritech" or the " Company" ) wishes to announce that its
wholly-owned subsidiary, Anhui Clean Environment Biotechnology Co. Ltd, had on 28 February 2014, been awarded a RMB24.36 million waste water treatment contract (" Contract" ) by HuaRong
Xuehua Brewery (Henan) Co.
Ltd (" HuaRong" ).
 
The
Contract is to provide
1) the design of the waste water treatment plant 2) construct the structural work
of the waste water treatment plant 3) supply and install the equipment of the waste water treatment plant and
4) adjust and commissioning of the waste water treatment plant with a total capacity of 8000m3/day
(the " Project" ).
 
The
Project is located at XueDianZhen Industrial Park, XingZhen City, Henan, China. This is a typical waste water treatment project for brewery industry, which Anhui Clean Environment Biotechnology Co.
Ltd has been specialising in for more than
10 years.
 
The
duration of the Contract is 400 days from
the
signing of the Contact, inclusive of 210 days for design
and construction, 90 days for adjustment and
commissioning
as well as 100
days for maintenance and handover.
 
None of the Directors
or
substantial shareholders of the Company has any interest, direct or indirect, in the
Contract
(other than
through their shareholdings in
the
Company).
 
The
Contract is not expected to have any material impact on the consolidated earnings per share and net
tangible
assets per share of the Group
for
the current financial year ending 31
March
2014.
 
 
 
BY ORDER OF THE BOARD
Dr Wang Xiaoning
Managing Director
20 March 2014
|
|
http://infopub.sgx.com/FileOpen/Ann_waste_treatment_contract_award_20Mar14.ashx?App=Announcement& FileID=289549
golden_SGX ( Date: 20-Mar-2014 19:39) Posted:
AWARD OF RMB24.36
MILLION WASTE WATER
TREATMENT CONTRACT IN CHINA
 
The
Board of Directors of Tritech Group Limited (" Tritech" or the " Company" ) wishes to announce that its
wholly-owned subsidiary, Anhui Clean Environment Biotechnology Co. Ltd, had on 28 February 2014, been awarded a RMB24.36 million waste water treatment contract (" Contract" ) by HuaRong
Xuehua Brewery (Henan) Co.
Ltd (" HuaRong" ).
 
The
Contract is to provide
1) the design of the waste water treatment plant 2) construct the structural work
of the waste water treatment plant 3) supply and install the equipment of the waste water treatment plant and
4) adjust and commissioning of the waste water treatment plant with a total capacity of 8000m3/day
(the " Project" ).
 
The
Project is located at XueDianZhen Industrial Park, XingZhen City, Henan, China. This is a typical waste water treatment project for brewery industry, which Anhui Clean Environment Biotechnology Co.
Ltd has been specialising in for more than
10 years.
 
The
duration of the Contract is 400 days from
the
signing of the Contact, inclusive of 210 days for design
and construction, 90 days for adjustment and
commissioning
as well as 100
days for maintenance and handover.
 
None of the Directors
or
substantial shareholders of the Company has any interest, direct or indirect, in the
Contract
(other than
through their shareholdings in
the
Company).
 
The
Contract is not expected to have any material impact on the consolidated earnings per share and net
tangible
assets per share of the Group
for
the current financial year ending 31
March
2014.
 
 
 
BY ORDER OF THE BOARD
Dr Wang Xiaoning
Managing Director
20 March 2014
|
|
AWARD OF RMB24.36
MILLION WASTE WATER
TREATMENT CONTRACT IN CHINA
 
The
Board of Directors of Tritech Group Limited (" Tritech" or the " Company" ) wishes to announce that its
wholly-owned subsidiary, Anhui Clean Environment Biotechnology Co. Ltd, had on 28 February 2014, been awarded a RMB24.36 million waste water treatment contract (" Contract" ) by HuaRong
Xuehua Brewery (Henan) Co.
Ltd (" HuaRong" ).
 
The
Contract is to provide
1) the design of the waste water treatment plant 2) construct the structural work
of the waste water treatment plant 3) supply and install the equipment of the waste water treatment plant and
4) adjust and commissioning of the waste water treatment plant with a total capacity of 8000m3/day
(the " Project" ).
 
The
Project is located at XueDianZhen Industrial Park, XingZhen City, Henan, China. This is a typical waste water treatment project for brewery industry, which Anhui Clean Environment Biotechnology Co.
Ltd has been specialising in for more than
10 years.
 
The
duration of the Contract is 400 days from
the
signing of the Contact, inclusive of 210 days for design
and construction, 90 days for adjustment and
commissioning
as well as 100
days for maintenance and handover.
 
None of the Directors
or
substantial shareholders of the Company has any interest, direct or indirect, in the
Contract
(other than
through their shareholdings in
the
Company).
 
The
Contract is not expected to have any material impact on the consolidated earnings per share and net
tangible
assets per share of the Group
for
the current financial year ending 31
March
2014.
 
 
 
BY ORDER OF THE BOARD
Dr Wang Xiaoning
Managing Director
20 March 2014
Cashed in at 0.25 to book some profits. Troublesome to sell the warrants after that also.