REPOST
PRODUCTION, DEVELOPMENT & EXPLORATION ACTIVITIES FOR THE QUARTER ENDED 30 JUNE 2013 (Q2 2013
Company's  update on  the 3 production oil fields with Tanjung Miring Timur TAC (Interra 100%) saw the largest increase in production.
Pls read more http://infopub.sgx.com/FileOpen/Activity_Report_2Q2013.ashx?App=Announcement& FileID=249813In Q2 2013, gross production was 109,489 barrels of oil, an increase of 210% as compared to the previous quarter of 35,322 barrels of oil, mainly contributed by the new well TMT 53.
FOR THE QUARTER ENDED 30 JUNE 2013 (" Q2 2013" )
Company's  update on  the 3 production oil fields with Tanjung Miring Timur TAC (Interra 100%) saw the largest increase in production.
Read more http://infopub.sgx.com/FileOpen/Activity_Report_2Q2013.ashx?App=Announcement& FileID=249813In Q2 2013, gross production was 109,489 barrels of oil, an increase of 210% as compared to the previous quarter of 35,322 barrels of oil, mainly contributed by the new well TMT 53. PRODUCTION, DEVELOPMENT & EXPLORATION ACTIVITIES
bro oct, thanks for the info,
dua huat ah!
Octavia ( Date: 24-Jul-2013 17:42) Posted:
|
 
MYANMAR DRILLING UPDATE:
Interra Resources Limited (the "
Interra has a 60% interest in the Improved Petroleum Recovery Contract of the Yenangyaung field and also owns 60% of Goldpetrol which is the operator of the field. YNG 3256 is being drilled using Goldpetrol’s Cooper LTO 350 rig and thus drilling costs are expected to be comparatively low. Interra’s share of the cost of drilling will be funded from existing funds on hand.
YNG 3256 is drilled as an infill development well between recently completed producing wells YNG 3251 and YNG 3254. YNG 3256 is intended to be drilled to a depth of 3,000 feet with the primary objective of accelerating oil production from the reservoirs that produce in the offset wells.
Interra estimates that the results of the drilling and completion should be available in approximately six weeks. The Company will announce the results as soon as they may be ascertained as well as updates reflecting critical or unexpected events during drilling.
By Order of the Board of Directors of
INTERRA RESOURCES LIMITED
Marcel Tjia
Chief Executive Officer Company" or " Interra" ) wishes to inform shareholders that its jointly controlled entity, Goldpetrol Joint Operating Company Inc. (" Goldpetrol" ), has commenced drilling infill development well YNG 3256 in the Yenangyaung oil field in Myanmar.
DRILLING COMMENCEMENT OF
YENANGYAUNG DEVELOPMENT WELL YNG 3256
cutted my interra contra, loss 4 pips...jeep 505 cut 485
waiting for next jeep now....
huat to all!
Just came back singapore from work,
just saw the good news but weird the stock did not move much
hopefully can chiong chiong chiong ahhhhhhhhhhh
huat arghhhhhhhhhhhhhh another 110 bpd..

Expect more goodie bags on the way.
Congrats to all those vested.
 
Agreed Bro Medvih...oil exploration is a risky business and TP  will vary.
This counter  is so controlled if you monitored the px movement.
medivh ( Date: 22-Jul-2013 21:04) Posted:
|
MYANMAR DRILLING UPDATE: CHAUK DEVELOPMENT WELL CHK 1172 COMPLETED AS AN OIL PRODUCER
Interra Resources Limited (the “Company” or “Interra”) wishes to inform shareholders that its jointly controlled entity, Goldpetrol Joint Operating Company Inc. (“Goldpetrol”), has completed drilling development well CHK 1172 in the Chauk oil field in Myanmar as an oil producer and with such, has achieved a production milestone.
Interra has a 60% interest in the Improved Petroleum Recovery Contract (“IPRC”) of the Chauk field and also owns 60% of Goldpetrol which is the operator of the field. Since the well was drilled using Goldpetrol’s Cooper LTO 350 rig, costs were comparatively low. Interra’s share of the cost of drilling was funded from existing funds on hand.
CHK 1172 was drilled to a total depth of 2,600 feet as an offset to CHK 1166 which was completed in March 2013, producing in excess of 110 barrels of oil per day. The primary objective of CHK 1172 is to accelerate production from the reservoirs that produce from CHK 1166 and several nearby producing wells. Following five days of production testing, CHK 1172 has been completed through casing perforations over seven reservoirs totalling 41 feet averaging more than 200 barrels of oil per day.
This production rate makes CHK 1172 the current highest single well oil producer in the Chauk field and also marks a significant milestone as the current daily well head production rate of the Chauk field is now the highest since the commencement of the IPRC in 1996.
CHK 1172 marks the sixth well drilled in the Chauk field and the twelfth drilled in Myanmar in 2013, all of which have been completed as oil producers.
By Order of the Board of Directors of INTERRA RESOURCES LIMITED
Marcel Tjia Chief Executive Officer
bro Oct, if I tell you this one can go up to near 1 dollar in a few yrs time would u believe? I have no TP atm..
  i am vested for the long run cause this one is for retirement.. hehe
Octavia ( Date: 18-Jul-2013 21:26) Posted:
|
Octavia ( Date: 22-Jul-2013 16:19) Posted:
|
Hope this bb is catching the shortists at 50cens
then we huat liao!
Octavia ( Date: 19-Jul-2013 10:43) Posted:
|
Moving again.
BBs still in.Shld close unchanged or a pip or two  higher.